Segmental Precast Concrete Formwork System Q235B Steel Easy Install

Basic Information
Place of Origin: Shandong, China
Brand Name: BOYOUN
Certification: SGS; ISO
Model Number: Formwork System
Minimum Order Quantity: Negotiate
Price: Negotiate
Packaging Details: Standard or according to your requirement
Supply Ability: 60000 Ton/Tons per Year
Contact Now
Material: Q235B Steel Certificate: ISO9001
Usage: Easy To Use Color: According To Your Requirement
Surface Treatment: Painted Type: Bridge Form
MOQ: 50 TONS Tolerance: Standard Or According To Your Requirement
Formwork Design: Boyoun Supply Port: Tianjin/Qingdao
High Light:

precast concrete formwork system

,

girder formwork

Precast segmental box girder concrete steel formwork from Boyoun factory
 
PRODUCT DESCRIPTION
 
The modern formwork systems listed above are mostly modular, which are designed for speed and efficiency. They are designed to provide increased accuracy and minimise waste in construction and most have enhanced health and safety features built-in.

The bridge viaduct is divided into small segments, that are prefabricated in the good quality control casting yard, then, delivered to install by good erection equipment.

 

 

Formwork instructors

The Boyoun formwork in­struc­tors are spe­cial­ly trained and ex­pe­ri­enced prac­ti­tion­ers who know how to install

 

Iran Teheran expressway project.

The Teheran expressway project has begun its construction in the early a few decades ago.
The project total length is 140km, but stopped only for 30km.

Boyoun supplied
Segmental assembly box girder formwork

Tianjin–Baoding intercity railway project.

Tianjin–Baoding intercity railway, also known as Tianjin-Baoding Passenger Line,the railway length is 158 km and with a maximum design speed of 250 km. Most of the new trackage will be on an elevated viaduct, accounting for 65.4% of the line of the being on bridges.

Boyoun supplied
Segmental assembly box girder formwork

 

 

Advantages and Benefits

1. Construction Simplicity
• easier installation of external post-tensioned tendons

2. Time Savings/Cost Effectiveness
• precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• by using efficient erection method and equipment, the rapid installation of viaduct can be achieved.

3. Quality Control Q - A/QC
• precast segment to be produced in factory-manner condition w/ good quality control.
• minimum interruption natural impacts such as bad weather, rain.
• minimum waste of material
• good precision in production
4. Inspection and Maintenance
• external prestressing tendons can be easily inspected and repaired if required.
• maintenance program can be scheduled.

 

Key componets

1. Casting Yard and Segment Production
(Geometry Control Program and Software)
2. Segment Erection/ Installation and Equipments

 

Segment casting yard components

1. Short-Line Match Casting and Casting Mould Units
2. Production and Working Space
• Rebar Assembly
• Prestressing Work
• Segment Touch-up/ Repair
• Ready-mixed Concrete Plant
3. Lifting Equipments
4. Storage Area

 

All-in-one solution

Professional solution for each project

Prompt offer with competitive price

Process every unique project for client

 

 

 

Products

The formwork products, systems and design service include bridge formwork, tunnel formwork, and scaffolding.

Boyoun's business is based on a combination of production, equipment sale & rental, installation and maintenance.

 

Engineering

In Boyoun we invest heavily in R&D in order to add value to the industry. The Boyoun engineering department has created more than 40 patents and utility models.

 

This has enabled the implementation and industrialization process of "cast in place" concrete structures, in addition to providing added value in security and ergonomics.

 

Technology

We offer on site consultation and safety advice to help our customers work safely and improve productivity in each project.
The Boyoun Technical Office combines its staff experience with advanced CAD systems and self-developed software to do this job.

 

Boyoun Comprehensive Service

Boyoun strives to be one of the most recognized companies in its industry due to its comprehensive service capacity.
This output should be yield as a result of the quality of the company's human team, the range of solutions and services that Boyoun offers to its clients and its business management focused on total quality.

 

All-in-one solution

Professional solution for each project

Prompt offer with competitive price

Process every unique project for client

 

Formwork instructors

The Boyoun formwork in­struc­tors are spe­cial­ly trained and ex­pe­ri­enced prac­ti­tion­ers who know how to install

 

FAQ

1. Where is your factory?

Our factory is located in Binzhou city, Shandong province, where is 350km far from Beijing, 240km far from Tianjin port. Our sales office is located in Beijing city.

2. How fast can my order be delivered?

You can state your desired Delivery date for your order. The order and the desired delivery date will be checked after your order got sent.
When you receive your order confirmation, you will find the information on your final delivery date (outgoing). We will, of course, try our best to meet the specified delivery date.

3. What's the material of your products?

Steel Q235B or Q345B.

 

Contact Details

WhatsApp : +8618611976923